Construction continues at Westline as crews focus on finishing details throughout the residences and prepare several buildings for upcoming inspections. With exterior painting complete, attention has shifted to interior detailing, fixture adjustments, and the final touches that bring each residence closer to completion.
Construction Milestones
Completed: Exterior Painting Final exterior painting is complete, revealing the finished architectural character of the buildings and their place within the historic Clarksville neighborhood. Coming Up: Electrical Inspections Final city electrical inspections are scheduled for several buildings, marking another important step in the construction process.
On Site This Week
Crews are working through final detail lists across the residences, including: • Interior paint touch-ups • Final sheetrock and trim detailing • Plumbing fixture checks and adjustments • Shower glass and mirror finishing • Final yard fencing These finishing stages involve careful attention to the smaller details, from interior surfaces and fixtures to the outdoor spaces surrounding each residence.
Looking Ahead
As finishing work progresses, the next steps include scheduled inspections and final approvals. In an upcoming Westline Journal feature, we'll take a closer look at the community's rainwater collection system and how this thoughtful sustainability feature supports the landscaping throughout the property.
Discover Westline
Westline brings together just 16 boutique residences in the heart of Old West Austin, combining the privacy and space of a single-family home with the ease of lock-and-leave living. Set within an established neighborhood just around the corner from downtown Austin, Westline offers a distinctive approach to modern living. Explore available residences or contact Linda Miller, Christie's International Real Estate, to schedule a private preview.
